CPWD Guideline, Rules & Forms for

CPWD Guideline, Rules & Forms for

Enlistment of Contractor in CPWD

About CPWD

1.0 Central Public Works Department (CPWD) under Ministry

of Urban Development is entrusted with construction and maintenance of buildings

for most of the Central Government Departments, Public undertakings and Autonomous

bodies.

2.0 Vision Statement Excellence in Public Works

3.0 Mission Statement

3.1 Sound Planning and Design

3.1.1 All buildings norms and specification to be standardized.

3.1.2 Architectural and structural design to be undertaken

and coordinated to evolve an efficient building system compliant with latest Indian

Standard.

3.2 Engineered Construction

3.2.1 Mechanization in construction including use of

innovative materials and techniques.

3.2.2 Conservation of energy and natural resources and

clean environment in construction stage.

3.3 Effective Maintenance

3.3.1 To preserve and maintain buildings and services

in good operating condition and to adopt latest state of development taking place

in built environment

3.4 Benchmarking

3.4.1 Updation of Standards and Specifications for public

works and their publication at regular interval.

3.4.2 Updation of Delhi Schedule of Rates and Analysis

of Rates Updation of works and Maintenance Manual on regular basis & their publication.

3.5 Capacity Building

3.5.1 Updation of technical knowledge of engineers, architects

through training and high level refresher courses and participation in seminars,

workshops etc.

3.5.2 Target oriented training to maintenance workers

on contemporary skills and behavioral science to improve service delivery mechanism.

3.6 Manpower planning

3.6.1 To achieve excellent working opportunities and

professional environment.

3.6.2 To provide performance and ability based approach

to career development as per policy of the Government.

3.7 Transparency in work management

3.7.1 e-tendering being introduced.

3.7.2 Effective use of websites in discharge of regulatory,

enforcement and other functions being introduced through integrated computerization.

3.7.3 Web based work progress monitoring system is being

introduced.

4.0 Mandate for CPWD

4.1 Construction works:

4.1.1 Provide Turnkey Project Management services from

concept to completion of buildings with inbuilt quality assurance, financial and

technical accountability.

4.2 Maintenance Services

4.2.1 Provide a comprehensive network of service Centres

for recording, redressel and monitoring of complaint through single window system.

4.3 Grievance Redressal Mechanism

4.3.1 Designated Grievance Officer shall ensure effective

redressel of Public Grievances.

4.3.2 Designated Nodal Officer at Directorate shall:

Ensure that processes needed for rendering effective services to users are established,

implemented and maintained including getting feedback on user satisfaction.

5.0 Solicits from Users

5.1 Construction works:

5.1.1 Assistance and cooperation by providing ownership

documents etc. for land and building to obtain approval of building plans and clearances

for service connections of their behalf from local bodies and to take over the completed

work expeditiously.

5.2 Maintenance services:

5.2.1 Not to make any unauthorized construction of any

additions / alteration, tempering of installations of the premises allotted to them.

5.2.2 Maintain the accommodation allotted and the surroundings

in a hygienic manner and conform to the rules and regulations of the local bodies

in this regard.

5.2.3 To produce No Dues Certificate from service provider

at the time of vacation.

CPWD Guideline, Rules & Forms for Enlistment of Contractor

in CPWD


Rules of Enlistment of Contractors in CPWD, 2005

Enlistment Form

Note : the Content of this Page has been taken from http://cpwd.gov.in , a Central Government Undertaking official Website. This content is for the Information of Government Contractors only. For detailed and Updated Information please visit official website of Central Public Works Department (CPWD).

by: Swapnil Anand
Pharmaceutical Companies How To Deal With The "standard" Cost Pressures Using Maya to Create 3D Models What is Inventory Control? Sluggish Cooking Infant Back Ribs from the Oven ¿Cómo Se Hace La Cirugía De Glúteos? Slow Cooking Infant Back again Ribs within the Oven G Headshot Course by Jani G & Dylan Loh Sluggish Cooking Infant Back again Ribs inside Oven Slow Cooking Infant Back Ribs inside Oven Zikula – Made Your Way more Easy Ao contrário do que muitos pensam, em diversos casos, a marca não é o principal ativo intangível das empresas Attaque De Panique Does Unique Hoodia Work?
print
www.yloan.com guest:  register | login | search IP(216.73.216.163) California / Anaheim Processed in 0.021632 second(s), 7 queries , Gzip enabled , discuz 5.5 through PHP 8.3.9 , debug code: 157 , 4998, 85,
Cpwd Guideline, Rules & Forms For Enlistment Of Contractor In Cpwd Anaheim