Marketing Advertising Branding Careers-Employment Change-Management Customer Service Entrepreneurialism Ethics Marketing-Direct Negotiation Outsourcing PR Presentation Resumes-Cover-Letters Sales Sales-Management Sales-Teleselling Sales-Training Strategic-Planning Team-Building Top7-or-Top10-Tips Workplace-Communication aarkstore corporate advantages development collection global purchasing rapidshare grinding wildfire shipping trading economy wholesale agency florida attorney strategy county consumer bills niche elliptical

Grinding Mill Installation, Commissioning

First, the installation of grinding mill

First, the installation of grinding mill

1 , first mill gear hanging into the pit , good attention to controlling the center of a certain height and then use the standard instrument correction "B" plane , while bolt into the hole reserved .

2 mill host installation. Installed before the base contacts the bottom surface and the cement foundation and anchor bolts connecting office rubber shock pad between the pad (see Figure 2 ), then the level of instrument calibration box -shaped base "A" plane , calibration points, four points for the cross- cross lines , while Tone , its different degrees should be less than 0.20 mm shaft , E1 - E2 is not greater than 0.1 mm shall not be parallel , "E1", "E2" The gap should be kept within 5-8 mm .

3 , pipeline equipment location and height should always plan to install , not an arbitrary change and heightening, the pipe joints should be sealed , not a leak , after fastening the phenomenon . Electrical equipment should be accurate and reliable, the components to be installed after the test machine should be carried out .

Second , grinding mill debugging (empty running test machine)

1 , the pressure spring work height ( effective height after being compressed ) the lower the pressure roller on the material the greater , the higher the yield , but should be based on the load situation of main motor , with the mill roller is small Gradually compressed . Pressure spring work height of not more than 80 , temperature should not exceed 35

2 , empty load running test machine , in the absence of load test machine, roll grinding devices should adopt a rolling prison network wire rope , roller and grinding ring to avoid contact with the impact , then the host air test machine running at least 1 hour ; Host Operation should be smooth , cabinets oil temperature should not exceed 80 , temperature does not exceed 40 . Analysis of the host machine and the direction of rotation shown in Figure 4 .

3, blower should load boot , after the load to be operating normally , and then observe its smooth operation, no abnormal noise and vibration , bearing maximum temperature of over 70 , temperature should not exceed 35 .

4 , load test machine running time of less than 8 hours , after the Raymond machine is working properly no abnormal noise machine , the pipe joints leak wind generated by the test machine again to tighten the compact solid , can be put into regular use .

by: zgxzenith
Grinding Mill(7.28) coal mill for fine powder grinding Joyal Three-ring Micro Powder Mill Used For Super-fine Grinding Materials Grinding Mill Maintenance And Operation Principle Improve Ball Mill Grinding Fineness Skills Generalizations Stress Of Grinding Zenith Grinding mill open green " paper stones "processing JOYAL Simple structure Grinding Plant Information You Need To Read On CBN Grinding Wheels Crusher and grinding mill --- impact crusher --- PF and PFW impact crusher Crushing and grinding mill -- cone crusher -- HP cone crusher and HCS cone crusher Zenith Grinding Mill Is In Demand In The Coatings Industry The Improvment Of Grinding Mill
print
www.yloan.com guest:  register | login | search IP(216.73.216.180) California / Anaheim Processed in 0.018566 second(s), 5 queries , Gzip enabled , discuz 5.5 through PHP 8.3.9 , debug code: 19 , 2644, 416,
Grinding Mill Installation, Commissioning Anaheim