Online Business Site Promotion Web misc Affiliate-Revenue Auctions Audio-Streaming Autoresponders Blogging-Rss Email-Marketing Ezine-Publishing Forums Internet-Marketing List-Building PPC-Advertising Podcasting SEO Spam-Blocker Traffic-Building Video-Streaming Web-Design Web-Development Web-Hosting Domain Name soreness web analysis vinyl mlm searching media info spyware access microsoft outlook farmville

N-1-1 Contingency Analysis to meet the NERC Compliance Standards

N-1-1 Contingency Analysis to meet the NERC Compliance Standards


The Transmission Planning (TPL) standards define reliable system performance following the loss of a single bulk electric element, two or more bulk electric elements, or following extreme events.

The loss of two elements has been historically performed using N-2 contingency analysis, which corresponds to the loss of two bulk electric elements simultaneously.

A forthcoming, more stringent, NERC TPL standard also requires N-1-1 contingency analysis, which corresponds to the loss of two elements consecutively. The system adjustments should be performed after the 1st N1 contingency, and may be performed after the 2nd N-1 contingency in each N-1-1 contingency pair.


There is a growing need to provide the system planners with fast automated process to effectively perform NERC-compliance studies. The framework for N11 and N2 contingency analysis should have the capability to perform the following computations within one simulation run:

Identify critical contingencies that cause violation of voltage, thermal and steady-state stability limits;

Determine transmission system bottlenecks;

Determine potential cascading modes;

Compute minimum amount of necessary system adjustments ;

If load shed is required, minimize the amount of load curtailment in order to maintain reliable operation of the power system;

Provide automatic reporting capabilities.

System adjustments may include: MW dispatch, MVAr dispatch, transformer tap change, phase shifter adjustment, capacitor and reactor switching, line switching, and load curtailment.

It is of the utmost importance to ensure that the analysis framework is based on the AC analysis methodology that allows to monitor voltage, thermal and steady-state stability limits.

Since a variety of N-1-1 scenarios may be implemented, the analysis tool should be very flexible in order to be quickly and easily adjusted to the need and specifics of a particular utility or an ISO.

The strategy to perform massive N11 AC contingency should focus on providing the Planning engineers with a solution that has the following capabilities:

Automatic creation of N11 contingency lists;

Automating the process of N11 contingency analysis;

Allowing the user to implement various sets of system adjustments within a single run;


Incorporating the analysis of cascading outages;

Providing easy and flexible reporting and post-processing consistent with the utility/ISO practice.

In addition, this process should be used to assist the planners in optimizing the transmission system expansion which will reduce the blackout risk and improve transmission system reliability. Therefore, the solution should have the capability to perform massive contingency analysis - hundreds of thousands to millions of contingencies - per single run.

For more details on the use of Physical and Operational Margins (POM) Suite for N-1-1 contingency analysis, please visit www.vrenergy.com.
Case Analysis Report of Osama Bin Laden Proactol Clinical Analysis: Doet It Bring Any Effect? Choosing Superb Akai Water Ionizer Analysis How To Avoid Over-Analysis On Your Date New Report on "IEC 61850 Routers and Switches in Smart Grids: Opportunity Analysis to 2015" added in Vision Shopsters Vision Shopsters: Crohns Disease - Drug Pipeline Analysis and Market Forecasts to 2015 Equus 3160 Innova ABS plus Experienced CanOBD2 Analysis Code Scanner Investment Analysis Report on China wind turbine blade Industry Advanced Metering Infrastructure (ami): Smart Grid Global Opportunity Analysis Complete Analysis On Vimax Results Analysis of the "Zip Code" TraceGains Robert Hudson Discusses Certificates of Analysis The Analysis of Functionalities and Modifiable Features of Leawo Blu-ray Ripper
print
www.yloan.com guest:  register | login | search IP(216.73.216.61) California / Anaheim Processed in 0.017434 second(s), 7 queries , Gzip enabled , discuz 5.5 through PHP 8.3.9 , debug code: 42 , 3173, 354,
N-1-1 Contingency Analysis to meet the NERC Compliance Standards Anaheim