A really good scope of work is probably one of the most overlooked elements in the construction contract

. Outlining the project costs and contractor's obligations protects both the homeowner and the builder.

The following story shows how even a simple project can go awry without a clear scope of work.

I called up Jim to help on a straightforward job. I told him that I had a project at 123 Main Street. I need to remove the old driveway, pull up the bushes, backfill and replace the concrete. He was to call me back with an estimate. (It's not uncommon for busy builders to work out agreements over the phone instead of meeting personally at the job site. As you will see, this method has its shortcomings.)

Jim calls back the next day to tell me that it will cost $5,500. That is reasonable and I tell him that I will call when ready.


Six weeks later, I was ready for Jim to begin. I didn't make time to meet with him at the job site, but I went to check on things after he and his crew had put in a good day and a half's labor. Right away I could see there was a problem:

Me. Why aren't those bushes out?

Jim. I thought that you were talking about just this one bush by the sidewalk, not that whole row of bushes.

Me. No, I meant all of them.

Jim. Well, that's going to be about $120 extra. Also, I need another check for $125 because I'm getting the fill sand today.

Me. I thought the sand was included in your price.

Jim. We never include the cost for fill sand, because we don't know how many loads we'll use until everything is pulled up. There were also a bunch of tree roots under the driveway and it ate up a few saw blades.

Me. How much more will that it cost? (I think to myself-big tree right there, should have known about the roots.)

Jim. Let's see: $120 plus $125 plus $240 and $20 for the blades. $505 more.

I look around. Jim and his crew are working hard in the August heat and everything else on the job is coming along fine. It sure doesn't seem like he's trying to rip me off. His price was good to start with, so what do I do now? At this point my options are limited: have a screaming match, try to negotiate or just agree to pay the overage. Overall, the most valuable choice I made that day was recognizing an important lesson. Always have a clear and complete scope of work before a job starts.

Pulling together a good scope of work takes time and effort, but pays for itself many times over in the end. Here are some basics about the process:

Put it on paper: At the bare minimum, a set of plans or blueprints can serve as a scope of work. Smaller projects or remodeling jobs usually don't require a set of plans, in which case a written scope of work is doubly important.


For both big and small projects, make certain that all expectations are conveyed in both writing and talks with your contractor. Ask pointed questions, like "What else do you see that we need to include? I want to avoid change orders." Outline even obvious-seeming items. Never assume that XYZ trade surely will do this. Add a "cover-it-all" note on the end. Something like "Bid should include all items necessary for contractor to complete this project."

Meet and Review: Meet your contractor at the job site (more than once is best). Make lots of notes. Even if it goes against your basic nature (and what your mama taught you), don't be deferential. Charge right in there and say (or ask) what's on your mind. After these meetings, your scope of work should become even more defined. It doesn't matter if you or the contractor writes up the revised scope, as long as all items are accurately noted.

We all get busy, look for shortcuts and assume everyone is on the same page. Taking the time to nail down a clear, comprehensive scope of work will keep your change orders, costs and frustrations to a minimum. Once complete, make it part of the construction contract.

by: Julie Groth
Latest Universe Bingo News FAP Turbo Settings - The Settings That Cause You Best Success surely depends on the team efforts How Not To Use Your 401k The Leatherman Skeletool Car Types Clear Explanation Of Life Annuity Habitual Bingo Prizes Roth Ira Limits What To Consider When Converting Your Ira Destructive Chewing How to Lose 10 Lbs in a Week Find The Perfect Get Away With Languedoc Property For Sale
print
www.yloan.com guest:  register | login | search IP(216.73.217.110) California / Rosemead Processed in 0.017609 second(s), 7 queries , Gzip enabled , discuz 5.5 through PHP 8.3.9 , debug code: 38 , 4113, 85,
Nailing Down The Scope Of Work Rosemead