Welcome to YLOAN.COM
yloan.com » maintenance » The Maintenance Instruction Of Overflow Ball Mill
Games Personal-Tech Data Entry registry cruise torrent mac code virus storage uninstaller systems cisco bugs wireless codes maintenance dell update communication trojan atlanta Data Backup Data Storage Data Protection Data Recovery Anti-Virus Windows Linux Software Hardware Mobil-Computing Certification-Tests Computers & Internet Internet

The Maintenance Instruction Of Overflow Ball Mill

The ball mill is an indispensable part in the beneficiation equipment and plays an important role in the crush techniques

. The main types of ball mill are: cone energy-saving ball mill, Overflow Ball Mill, grid ball mill, tube ball mill, intermittent ball mill/ Ceramic ball mill, roller bearing ball mill, etc. In this text, Henan Hongxing Mining Machinery Co., Ltd. mainly introduces the operation, maintenance, and examination of the overflow ball mill, offering convenience to the ball mill customers for references.

1. The Attendance Instruction:

(1). The operation and maintenance personnel of the ball mill should master the structural behavior of the equipment and the name, specification, function of every section.

(2). The operator should keep to the four set principle. Lubricate according to the notes on the lubrication chart. The use of the raw waste oil is forbidden. Keep the lubricating point clean.


(3). Keep the bearing temperature lower than 60 centigrade degree. Check the bolts and make sure they are tight and there is no abnormal sound. Check and make sure the ore feed and the water supply both are constant, the barrel doesnt leak, the electric motor current and voltage are in normal condition, and the shield in the transmission part is in good order.

(4). Keep the facility environment clean. Other parts need to be disposed anytime apart from the operation part.

2. Maintenance Instruction:

(1). Repair cycle:

A. a month for fine repair

B. one to three months for minor repair

C. twelve to twenty four months for medium repair

D. sixty to one hundred and twenty months for heavy repair

(2). Repair content:

A. fine repair: mainly check the oil mass, adjust the gap between sections, enhance the bolts, change individual lining plate or check the wear pattern of the lining plate, and repair the feeder.

B. minor repair: check the wear pattern of the cleaning & measurement tooth surface and the lining plate, and change it when necessary.

C. medium repair: change the feeding parts, the transmission pinion and the bearing; disassemble and check the speed reducer; adjust the gear after its operation of 3-5 years and measure the hollow shaft after its operation of 3-5 years.

D. heavy repair: disassemble, check, clean, and measure all parts of the ball mill; repair or change the gear, hollow shaft, sphere tile, transmission shaft, pinion, and barrel according to the wear pattern; repair and change the electric appliance, and after the heavy repair to the electric appliance, the experimental operation and the acceptance check must be done.

by: jocelyn
How To Make Sure Your Maintenance Staff Runs Smoothly Best Dress Shirts: Useful Maintenance Tips Mechanics Union Fighting Air Canada Maintenance Deal Making The Most Of Electrical Maintenance Pipeline Maintenance With Industrial Drain Cleaning Tool Options Plumbing Maintenance List -- Averting Plumbing Issues Different Maintenance Ways On Different Raw Materials Rosewood Furniture How Yard Maintenance Maintains You Rental Property Maintenance Guide: Tenant Proofing Your Valuable Fixtures End Of Summer Vehicle Maintenance United Kingdom Truck Fleet Maintenance. Performing A General Car Maintenance Regular Tyre Maintenance For Smooth Driving Experience
print
www.yloan.com guest:  register | login | search IP(3.16.147.87) / Processed in 0.008244 second(s), 7 queries , Gzip enabled , discuz 5.5 through PHP 8.3.9 , debug code: 34 , 2752, 558,
The Maintenance Instruction Of Overflow Ball Mill