Welcome to YLOAN.COM
yloan.com » Running » The Preparatory Work Before Jaw Crusher Running
Sportboats Motors Recreation Sports Baseball Cycling Fishing Football Golf Martial-Arts Running Soccer Swimming Tennis Basketball Volleyball Squash Badminton racing Bowling Climbing Dance Gymnastics Handball Skiing

The Preparatory Work Before Jaw Crusher Running

1. Preparation before Starting

1. Preparation before Starting

(1) Check lubricating of main bearings; check whether the toggle plate and movable jaw, underlay of upper toggle plate can work well, and whether there is enough lubrication between toggle plate and underlay of upper toggle plate.

(2) Check whether all fixed parts are well fixed.

(3) Check whether the weight center of flying wheel and groove wheel is all right.


(4) Check whether the belt is installed well and replace with a new one if it is worn. Clear the belt wheel and groove wheel

with clean cloth if there is any oil stain on them.

(5) Correct the protecting devices if there are not in good condition.

(6) Check whether there are any materials in the crushing groove and clear it.

(7) Check whether the gasket is installed correctly or pressed tightly.

2. Starting of Jaw Crusher

(1) Start the machine only after making sure that the machine and transmission part can work in good condition.

(2) This machine can only start in no -loading condition.

(3) Stop the machine immediately if any uncommon phenomena occur. Start the machine only after checking and correcting.

3. Use of Crusher

(1) Start feeding after checking that the machine works well.

(2) Put the material evenly into the machine, and avoid putting material from the side or feeding too much to avoid over feeding, sudden load change or being blocked.

(3) Stop feeding before stops the machine. Stop the motor after all the materials are discharged.

(4) Stop the motor if there is any stagnancy due to the blocking up of material inside the machine.

(5) The other side can be used if one side of fixed jaw plate and movable jaw plate are worn.

(6) Check all fixed parts before starting to use and tighten the part if it is loosening.

With its high quality products such as Cone crusher supplier, Sand washer supplier, Combination crusher, Rotary kiln, Jaw crusher, Henan Hongxing mining machinery Co.Ltd has ascended in the front rank of the world in the exporting of mining equipments.

by: nicole
Ways Running Hip Pain Can Hamper Your Daily Life Stay Hydrated When Running Prevention Of Running Injuries Running In Asics Has Turned Out To Be My Habit In The Morning La Shox Pas Cher Parfaite Running Around Obsidian Plus Dreary Running Around A Thrift Store What Is Best Running Mehod Keeping Your Car Running Well To Feel The Enjoyment Of Running Using Restaurant Paging Systems Can Enhance The Running Of Operations Dental Consulting - Get Seasoned Assistance On Running Your Practice Property Frontiers Named Best Large Agent For The Third Year Running At Prestigious Aipp Awards Be Ready: Running With A Professional Speaker
print
www.yloan.com guest:  register | login | search IP(216.73.216.204) California / Anaheim Processed in 0.027854 second(s), 7 queries , Gzip enabled , discuz 5.5 through PHP 8.3.9 , debug code: 42 , 2788, 276,
The Preparatory Work Before Jaw Crusher Running Anaheim