What Should Be Mattered In Cone Crusher Maintenance
1.Cone crusher working note:
1.Cone crusher working note:
Mine must be allocated to the plate in the middle , forbidding the mine goes into the crushing cavity directly. Because it is easy to make crusher overload and the liner wear unevenly .
The condition of giving mine:
a. Mine evenly was distributed in the crushing cavity through the distribution plate.
b. Feeding ore can't higher than the level of rolling acetabular wall.
The crusher to the maximum size of giving mine couldn't be allowed equal to the mine mouth size ( the maximum size of giving mine