prior art sieve shaker
In certain prior art sieve shakers having one (or more) processing screens
, such screens cannot adequately deal with a surge in fluid flow or high fluid flow rates, e.g. During a "bottoms up" or riser pipe circulation condition. La other prior art systems, the discharge of one or more sieve shakers is fed to another
sieve shaker for further de-liquefying and de-oiling. Such a process necessarily requires at least two sieve shakers. However, on offshore drilling rigs, space is at a premium. For this reason, tiered or tandem sieve shakers are used to effect a finer screening of the mud on the second level. But, in high volume operations, such tandem sieve shakers may not be able to handle the throughput due to their limited size.
Accordingly, there is a need to enhance the capacity of a tandem
sieve shaker during high mud volume operations without increasing their "foot print", i.e., the area of floor space required by the base of the tandem sieve shaker.
prior art sieve shaker
By: eric
The Art of Refuse Miami Art Deco District Hotels What does pawnbrokers union square do? 3d Technology Is Taking Over The Entertainment Industry The art of embossing metal Magnify Entertainment in Life with Pool tables and Darts What is an Idea? All Art is Idea Understanding All About Goats And Boer Goats For Entertainment And Income The Art & Science of Making a Great Shot of Espresso Publish Your Own Art Book The Art Of Bookbinding In Human Skin Beaded Lanyards Make Entertaining and Useful Accessories Works of Art From Laughter
www.yloan.com
guest:
register
|
login
|
search
IP(216.73.216.144) California / Anaheim
Processed in 0.018653 second(s), 7 queries
,
Gzip enabled
, discuz 5.5 through PHP 8.3.9 ,
debug code: 6 , 1317, 297,