subject: Shenzhen Metro Construction Site Collapse Search And Rescue Work In Progress - Shenzhen Metro, [print this page] Rescue workers are busy in rescue Rescue workers are busy in rescue
Yesterday (July 19) morning around 8 o'clock, the Shenzhen subway station reconstruction project Peng board room floor suddenly collapsed, falling less than two workers to avoid flash, 2-storey board room tilt, security, Fire Departments of emergency scene rescue, rescued a worker was injured and hospitalized, the other workers still missing is not found. Once to rescue hampered by heavy rain, rescuers search not to rush into the pit. Until 3 o'clock yesterday afternoon, only want to remove board room into the tunnel rescue.
Sudden collapse of the pit floor office Shenzhen Baoan District
incident subway station reconstruction project construction site and Peng Chau. One worker said the site, around 8 o'clock yesterday morning, under heavy rain, some workers out of the board room to work, some workers are just getting up to go to work, suddenly, a 2-layer board room on the first floor of an office to ground subsidence, the office happen to have four workers, two of them ran out, the other two fell into the pit collapsed out.
Yesterday morning, reporters on the scene saw blockade Peng Chau Station construction site has been pulled up, two ambulances stationed at the scene, rescue workers observed in the outer edge of collapse office. Rain harder and harder, a two-storey house tilt board may continue to collapse at any time. Ground subsidence Department has more than 40 square meters, is located in an office board room level, there are many big pit iron rack, a bicycle, side banners and other items. Collapse office about 10 meters deep, has an underground tunnel through. According to Zhao master
introduced yesterday at about 8:00, he and Lao Zhu, old and fresh, overweight children in an office, working out, the ground suddenly collapsed, he hastened to the old fresh out of jump, This does not fall into the pit, but the Lao Zhu, overweight children are to avoid flash is less than stop. Lao Zhu, overweight children are carpentry, Sichuan. Soon, about 40-year-old Lao Zhu crawl out, the body is injured, but 20 years old overweight children has not found. Construction of side projects, according to the Department of
Zeng Yong, introduced yesterday morning at 8 am, the typhoon brought heavy rain, water on site led to land subsidence, and further with the underground tunnel through, causing partial collapse, about 17 meters deep, two workers fell to the, which a worker was rescued, but another worker missing. Not much wind and rain into the pit
rescue "Ground subsidence, the board room tilt, people dared not close, combined with wind and rain very, very difficult rescue," the workers said the scene was the alarm, police, fire, hospitals and other departments quickly sent to the scene. Soon, an injured worker from the pit to climb out due to multiple injuries was admitted to hospital. But collapse that penetrated more than 10 meters, and the collapse area increased at any time, rescue workers can not enter the pit rescue, another fell off workers not a trace.
Baoan District Emergency Centre staff said that too much rain, the ground suddenly collapsed, tilted board room at any time may continue to collapse, so rescuers can not rush down to save people.
Typhoon site, if any preventive measures? Yong said had done a lot of preventive measures, including pumping, check the site are not unsafe factors, also arranged for the person on duty, but because of too much rain, causing accidents. Originally, the projects almost completed, and who wants to place the accident, time delay of at least 10 days.