Board logo

subject: Control The Total Amount Of Cars In Chengdu Next Month, Opening Up The Hearings - Environmental [print this page]


"If you do not jam, I can save at least 1 hour every day." "Cars will grow, road repair just to catch up again, how do?" Yesterday, this newspaper launched after citizen observers Baoliao channel, the Report Hotline 86613333-1, Chengdu full search Forum ourcity very lively, citizens have observers around the block slowly suggestions.

Fact, not just traffic problems, your city we live in, you care about every aspect of your comments and suggestions can be combined in the newspaper Chengdu full search site (www.cdqss.com) launched "citizen observer" column expression. We will get in between you and the relevant authorities bridge the communication gap. You can call the hotline 86613333-1 newspaper, or send an email to cdgmgcy@163.com, also can log in Chengdu all search elements Forum OurCity plate speak.

Slow vehicle blocking the growth of hard and fast about how to effectively control? Observers doubt with citizens, the reporter interviewed yesterday Shijiao Wei responsible person. It is reported that next month on the 28th, Shijiao Wei will organize and convene a hearing to listen to representatives of the people related to industry representatives and the views of the community. The hearings will be the main vehicle for the reasonable control of growth in the total. Related departments will road traffic capacity, rate of motor vehicle travel, public transport system is built, and to take into consideration economic development level, size of cities, roads, and incremental

Environment Capacity and other factors, the integrated development of motor vehicle growth in total control program.

The city's vehicle fleet, 2440000

Is increasing every day thousands of vehicles

IT section of road the city was opened to traffic in August 2008, North New Avenue and around the city at high speed Interchange opened to traffic in September 2008, the Second Ring Road Tunnel in Guanghua Village, Renmin South Road Reconstruction

Project , Cheng Peng high speed into the city in paragraph Improvement Project (including viaducts), 50 pedestrian bridges Dengjun time Block was opened to traffic, subway Line 1, Line 2 construction ... ...

Municipal Construction Commission to provide the data show that in 2008 municipal construction investment 13.41 billion yuan, the center total length of 1804 km urban roads; 2009 municipal construction investment of 15.68 billion yuan, the center total mileage of 1,804 km urban roads. "Even so, the face of a sharp increase in downtown traffic, the speed of our road construction is still lagging far behind the growth in traffic!" Relevant person in charge says with resignation that in February of this year, Chengdu, within a large volume of motor vehicle and more than 2.44 million, while the average daily number of new motor vehicles have more than 1000.

Listen to public views of the trade community

The various factors considered Construction of pedestrian bridges, cancel roadway taking parking spaces, open up the city Duantou Lu, tricyclic Interchange reconstruction, main road construction overpass ... ... last year, for the downtown traffic congestion, Chengdu, blocking out the slow a series of "prescription." Can block these relief measures, and no apparent feel smooth to the public. February 20 this year, first introduced on the wrong time after work, according to the assessment of the relevant departments, "after the wrong time" morning and evening peak periods the overall road network within the Third Ring speed increased by 2.47%, 4.26%. "Even so, the reality is not so optimistic." Relevant responsible person said that the downtown traffic situation is still grim, according to the current vehicle growth rate, the wrong caused to work when the blocking effect of slow, it is possible after 4 months new vehicles were "offset" the.

Faced with this situation, the reasonable regulation of small

Car Growth, curb deterioration of downtown traffic congestion, Shi Jiaowei preparation held on April 28 motor vehicle growth in downtown Chengdu, the total control of policy hearings, listen to the public on behalf of, the relevant industry representatives and the views of the community. Related departments will be based on traffic volume, vehicle trip rates, the public transport system is built, and to take into consideration economic development level, size of cities, roads and environmental capacity of incremental factors, such as integrated development of motor vehicle growth in total control program.

Sign on behalf of the hearing

Must meet the following conditions It is understood that the hearing of this total of 19 participants of the hearing, including: members of the public on behalf of eight (with auto market people and people of the four car-free); experts and scholars in three related areas (transport, environment, economy experts each one); related industries on behalf of four (Chengdu Automobile Industry Association, Automotive Industry and Commerce Chamber of Commerce in Chengdu, City Public

Transportation Industry, City Taxi Association, each one); NPC 2,

CPPCC member 2.

"The collection of representatives of the public from next month." Relevant responsible person said. According to reports, the public must meet the following conditions apply: at least 18 years of age, with full civil capacity; hold the city accounts for more than 3 months or temporary residence; have a certain cultural quality, policy and strong oral communication skills ; enthusiastic about public welfare, there is a strong sense of responsibility; own a car, applied the name should be provided consistent with their own vehicles permit.

by: gaga




welcome to loan (http://www.yloan.com/) Powered by Discuz! 5.5.0