Board logo

subject: Thermal heating the cold this winter can secure - heating, heat - HVAC Industry [print this page]


Thermal heating the cold this winter can secure - heating, heat - HVAC Industry

North wind whistling, leaves flying, night will come winter, the weather's sudden change to a lot of people are somewhat confused, people on the "Heating" and now also become very dependent on the "urgent." Reporter went to Baotou Heating Relevant departments, enterprises, the urban heating system this winter and the heat protection of the interview situation.

Not long ago, there Baotou National Road Heating Pipeline burst case, 2 cranes, 1 excavator, 18 units of water Pump And 4 hair Motor Continuous 48-hour days and nights after the full repair, just two days later to restore the low-temperature low-pressure heating, and now they have all returned to normal. Baotou City, now heating registered enterprises are: Baotou Thermal Power Corporation, Baotou City, heating and operating offices housing management, Huarong Heating Company, the second power plant heating companies, limited liability company Huayuan Thermal, Jin Dali heat pipe Network Company, Baotou property Department. After the occurrence of the incident heating pipe burst, many heating companies said they will be in heating period, the further increase especially weak pipeline inspections and inspection efforts and improve the emergency repair plan to avoid similar incidents happen again.

Baotou Thermal Power Corporation, said: "In the heat during the operation, they have increased the Boiler And power supply facilities, and extended service once or twice a pipeline inspection efforts, and in semi-urban and urban heat away from the power line route and the implementation of 'one day an investigation report' system, to detect non- safety hazards. The same time, strengthening emergency Rescue Capacity-building and emergency rescue team, emergency rescue plan drawn up and ready to deal with emergencies and accidents. Further strengthen the heat source, heat network deployment, in accordance with the quality of tuning curves, the heat source to provide qualified heating temperature and flow rate, the heating, the heat has already conducted two rounds of network regulation, to ensure the system front end and the end user even heat. "

Far, Baotou City, gas, heat, "good facts" works are still tight construction, has completed the construction of 30.7 km of heating pipe network, the city started 29 new thermal stations, has completed 22. East River District Huayuan company replace small boilers heat 7 in the thermal station is currently being modified. Maintenance and reconstruction of Baotou City, the second heating pipe work has been completed the transformation of 121,407 m of secondary pipe network to improve the quality of the residents of heating provides more protection. Expected end of 2009, Baotou City in Urban central heating area will reach 46.47 million square meters, new heating area of 6,060,000 square meters, heating net charge of 770.8 km, over 300 thermal station, central heating penetration will reach 85%.

Related Reading: Residents residents with heating pipes burst Cold Night "flood"

Xi'an in advance is imperative to warm heating needs to pay attention to The three elements of the winter heating

"conception" escort




welcome to loan (http://www.yloan.com/) Powered by Discuz! 5.5.0