Board logo

subject: X-calibur Construction Chemistry Inc. [print this page]


Burj Dubai Lake Fountain Program
Burj Dubai Lake Fountain Program

An area of 20,000 square meters of the lake was previously used as a temporary lake to capture storm water runoff and had been subjected to bacterial growth. These areas were cleaned to remove bacterial growth and then treated with X-Treat Sanitizer to sanitize the surface of the concrete to prevent future bacterial growth. Surface preparation was completed using a captive blasting technique. http://www.x-calibur.us. Six captive blast teams were able to prepare 6000m2 of concrete surface per day. That process produced a lightly exposed aggregate finish that revealed all the bug holes (blow holes). X-Shield Bug Fill, a two component high-build thixotropic epoxy resin, was used to fill bug-holes and surface imperfections prior to coating the lake bed. http://www.x-calibur.us.

Only 4 years old and a central feature of the prestigious Westin Diplomat Hotel, the group of 3 fountains was discovered to be leaking water into the foyer and below ground parking area. http://www.x-calibur.us.The fountain constructed from concrete was originally coated with an epoxy coating which was showing signs of cracking and delamination. As these fountains were located in the central reception area of a very busy hotel any remedial work had to be carried out quickly with minimal disruption to guests. http://www.x-calibur.us. The need was for a lining system that would cure quickly allowing quick return to service, flexible UV and chemical resistant and could function under full immersion.

Rawmat HDB - Waterproofing Case History

The elevator pit needed to be deepened to satisfy building codes. The elevator shaft was also prone to frequent flooding due to the high water table. http://www.x-calibur.us.Geotechnical investigation identified Perchloroethlene (Perc) in the ground. Perc is extremely volatile and classified by the EPA as a Class1 carcinogen. Perc is a strong solvent and very aggressive to most waterproofing materials. The problem was finding a waterproofing system that would resist Perc. http://www.x-calibur.us.Under the direction of Environmental Consultant GZA, contaminated water was collected and used to test Rawmat HDB membrane to prove that the product would be resistant to the Perc contaminated into system.

Reflecting Pond, 3M World HQ

Originally built in the late 1960s, this Reflecting Pond was lined with asphalt and contained 3ft deep water. Due to the harsh Minnesota winters the pond only held water for 6 months of the year (May-Sept). http://www.x-calibur.us. Over time, the asphalt substrate had cracked and it was costing the owners $30,000 to $40,000 per year to keep the pond watertight. The need was for a lining system that could waterproof the aged and cracked substrate and also withstand the 6 months wet and 6 months dry UV exposure for many years with out cracking. http://www.x-calibur.us.

Renovation of Hotel Roof

The existing roofing system was a 16 year old 8000 ft2 EPDM fully adhered membrane roof. Constant maintenance and repairs had been completed over the life span of this system. http://www.x-calibur.us. Numerous leaks into the structure had frustrated the management and prime rental rooms were unable to earn revenue because of water damages, falling drywall and the odd odor of mildew. It was determined that bad flashing details, splitting seams and screws from the mechanical attachment of the 1" ISO insulation were backing out and popping through the EPDM membrane.

X-Shield FS450 - Big Springs Fish Hatchery

The existing concrete substrate was painted with a lead based paint that was flaking and delaminating. http://www.x-calibur.us. There were also traces of PCB contamination in the concrete. The fish hatchery was located up stream of a heavily fished spring which presented the danger of contamination to both fish and wild life in addition to local residents. http://www.x-calibur.us.There were also numerous cracks in the concrete. A total of 52,000 ft2 of concrete need to be coated. After the lead paint was safely removed the Engineer required a coating that would form a dense barrier to the contaminated concrete and also have the ability to accommodate the cracked concrete. http://www.x-calibur.us. A key factor was also that the coating had to be no toxic to fish and wildlife.

Sheikh Khalifa Stadium

Due to the complexity of the cladding design many of the gutters were unsuitable for the specified Hypalon sheet membrane to be used as it requires to be cut, welded and glued. In addition the gutters had many penetrations. http://www.x-calibur.us.The cladding sub contractor required a fast cure liquid membrane as many other trades were on the roof and we jumping in and out of the gutter. http://www.x-calibur.us. This traffic would damage a conventional liquid membrane as it would need more than 24 hours to cure.

by: vishnudev2010




welcome to loan (http://www.yloan.com/) Powered by Discuz! 5.5.0