Board logo

subject: Dianchi Lake in Kunming seized three day growth of anti-Blue Green Algae Cyanobacteria - cyanobacteria, Dianchi Lake - water industries [print this page]


Dianchi Lake in Kunming seized three day growth of anti-Blue Green Algae Cyanobacteria - cyanobacteria, Dianchi Lake - water industries

Of drought and human and livestock Drinking water Be solved at the same time, how to conserve water? Air quality will be affected? Spring garden is the growth of germinating plants were, how should solve the water problem? This, the government will introduce measures? (April 13), Kunming, water, gardens, Environmental protection , Yunnan management departments on the seedling drought, water conservation, Environment Monitoring the situation of Dianchi Lake water quality related measures were introduced.

Jieshui Ban: have leaks reported to the scene within 1 hour

Kunming Jieshui Ban informed, nearly three months, the public to report leaks, waste water, telephone 50, the inspection of the 152 passengers. Recently, the introduction of a new regulatory requirements also found that leakage, a small repair to be within 24 hours, repair, overhaul must be a continuous operation until repair. Received the report leaks, maintenance personnel must be repaired within 1 hour scene.

Recently, the city government once again introduced new rules, all of the water index compress 20%, and asked all units to strictly implement the water plan, where in April 1 to May 31 over the period from planned targets for water by 1.5 times The maximum rate of water increases water collection plan, the public water for more than 10 tons per household per month or increase fees and charges. So far, 75 units due to limited water and active closure Decoration .

Far, 244 have been built in Kunming reclaimed water use facilities, the design scale processing 81,500 cubic meters per day. In addition, under construction in the reclaimed water use facilities, a total of 161, with a total design capacity is 36,000 cubic meters per day.

Garden Bureau: suspension of planting before the rainy season

It is understood that, since 2008, Kunming urban green space for more than three million new trees, plant trees in order to Kunming, full of water to drink, now deployed in the green water truck every week in Kunming include more than 4,700 motorcycles were, 11000 people within the city green space for water conservation. Each sprinkler vehicles are guaranteed to have at least two drivers, in order to avoid traffic jams, the main sprinkler irrigation during the day and the outside edge of the town's green belt, water at night into the city center, 24-hour break earnestly car prodigiously. According to departmental computing landscape, urban green car fuel water per day fee for 80 thousand to 100 thousand yuan, the city government has recently allocated to 14 counties and the corresponding subsidy. Watering plants, water is recycled water, the water is passed Sewage Treatment plant after the compliance of the water.

Kunming city this year to complete the planting 800,000 trees. Kunming Garden Sector, in previous years, in January began the practice of planting trees, the face of severe drought years, decided not to rain this year did not start. Currently, the 800 000 trees in the nursery of custody, the rainy season to start planting on the full. It is understood that a new plant in Kunming city nearly two years, the 300 million trees currently only 1% mortality rate.

Environmental protection Board: The special regulation on polluting industries

Kunming Environmental Protection Agency informed: As of April 9, the main city of Kunming, good air quality rate remained at 100%, The good level of days 6 days. Continued Arid Kunming rainfall is low so serious, leading to a sharp decline in the city's hydroelectric power. To protect the living and industrial production of normal power, at present, Kunming-fired power generating capacity has been increased. Kunming Environmental Protection Bureau which said that the current environmental authorities from the dust pollution, coal smoke pollution, vehicle exhaust and industrial pollution control four aspects of the city's key control region of the integrated environmental management, and the city on wind direction and the key areas of construction and demolition carried out supervision and inspection of construction sites, the report found abnormalities in a timely manner, analyze the results and countermeasures.

The same time, EPA also carried out on the Kraal River, Funan River, as the River Po, Mantis and Sichuan basin sewage enterprises special rectification action to ensure Kraal River water quality of Dianchi Lake - Kraal River supplement project requirements .




welcome to loan (http://www.yloan.com/) Powered by Discuz! 5.5.0