When helping clients seek a loan for a commercial property, mortgage brokers are in a prime position to sort through and explain the various due-diligence requirements. For commercial loans, engineering due-diligence studies have become especially important. These often are done via property-condition assessments PCAs.

Brokers can help their clients by understanding what goes into a quality PCA and how to identify potential discrepancies when reviewing the reports.

TWO-PHASE APPROACH:

PCAs help lenders understand the type of capital risk involved with the key site systems on the property a borrower is using as collateral. The PCA-preparation process often has two phases.

First, engineers conduct a field inspection of the material asset. They visually evaluate mechanical, electrical and plumbing components, as well as the building shell and structural members, for integrity and condition.

* Asset type and grade, including whether it complies with regulatory building mandates;

* Condition of the critical building systems and site features;

* Short-term cost of correcting deficiencies; and

* Long-term cost of operating and maintaining the site and structures.

BEING THOROUGH:

Industry standards require PCA reports to consist of a visual observation of site components and elements.

Often, discrepancies in PCA reports can be traced to poor data-collection techniques during the field inspection. Field engineers are the frontline observers in a real estate due-diligence study and the most-critical members of the inspection team. They relay site information to underwriters and technical managers who have never visited the property. When field inspections are not thorough and detailed, the results can be catastrophic for lenders and property-owners. For example, in one instance, a field engineer inspected a building's 100,000-squarefoot flat-roofing system. The inspector traversed a small area of the roof surface in the vicinity of the roof hatch and concluded that the roof was in good condition with only minor signs of deterioration and some loose fasteners that could be repaired.

In another example, a field engineer inspected a relatively new apartment complex. Based on the date of construction and without removing any electrical-receptacle covers, the engineer concluded that the electrical branch wiring was copper. Later, building maintenance discovered that the branch wiring was aluminum. Although aluminum wiring is widely permitted and used in high-voltage transmission lines and service entrances, it can be a fire risk in some instances.

Such misses during a PCA inspection can result in catastrophic financial losses for a lender and in some cases, death or serious injury to inhabitants, resulting in further liability and costly litigation for borrowers.

BEYOND THE MINIMUM:

Inspections for large commercial structures often require engineers to cover 10 percent of the net-rentable-floor area. Property-managers, however, may steer field engineers to a non-representative sample of the building areas.

For everyone to have a solid understanding of the entire site, it is important for PCA inspections to encompass a full representative sample of the property. Some lenders and property-buyers will even require 50-percent to 100-percent unit inspection to avoid such pitfalls. Structural failures are expensive to repair, can pose life or safety risks to building occupants and employees, and sometimes may warrant revoking the certificate of occupancy.

Engineering-consulting firms must take the necessary measures to ensure their field inspectors adhere to the standard practice for conducting PCAs. These measures should include an intensive, in-house training program and education on site-inspection protocol, streamlined site-inspection checklists, and degreed and accredited engineers conducting the inspections.

by: Joe Derhake