Board logo

subject: Wave City Ghaziabad an Introduction [print this page]


Wave City Ghaziabad an Introduction
Wave City Ghaziabad an Introduction

Wave Infratech Present Wave City, NH 24 in Ghaziabad. Wave City offers Residential Plots Eco friendly town planning by BENTEL ASSOCIATES, South Africa. Wave city offers great facilities such as a Educational, Medical Facility, Communication Facility, Electric Sub Station, Community Facility.Residential Plots-Sizes on offer: 135 sq yds,194 sq yds,287 sq yds.Tentative Rates to be disclosed shortly,Built-ups:Independent/Expandable Floors & Villas. SCOs-Shop cum-Office Complex Plots.

Wave City Key Feature:-

Right on NH-24 with GT Road on one side & FNG Expressway on the other, the location for Wave City will set new standards for all that is progressive and elegant.

Township is divided into manageable and compact sectors with regulated single entry/ exit points.

Paved roads with high quality riding surfaces.

Underground optical fibre cables for telecommunication, electricity distribution, storm water drains and sewer systems.

Efficient power distribution network.

Regulated, potable water supply.

Solid waste management with participation of residents.

Rechargeable pits for rain water harvesting.

Ample green cover and landscaping.

Township maintenance and upkeep by a reputed maintenance agency.

Wave City Location Advantage:-

Ghaziabad proximity to Delhi in comparison to Dwarka, Gurgaon and Faridabad is a definite advantage.

Very Close to Proposed Mega Rail Railway Station in Anand Vihar.

Very close to Proposed International airport on the side of river Yamuna.

GDA development plans to improve city accessibility and connectivity.

Bye pass connecting Meerut road crossing to Sihani Gate.

NH-24 to NH-58 link 8 lane expressway

17 Flyovers to address the entire traffic bottleneck.

Approval of Metro Connectivity Route----- Anand Vihar Kaushambi - Vaishali - Vasundhara Indirapuram LalKuan Kavi Nagar.

Wave City NH- 24 Development Status :-

Construction /development of site camp is in full swing, site office and site lab is complete with walls, roofing to start on Monday (i.e 20/12/10) onwards.

Construction of 45 m road connecting NH-24 has been started at the site, Approx. 650 meter length of road is complete with GSB.

Cleaning, grubbing & demarcation of main arterial road (57 meter wide road) started at site.

Establishment of Nursery is in full swing.

Development works Public health services like sewer, storm water drain, rain water harvesting has been started in sector 2 & 4.

Community site hoardings construction started.

Complete demarcation /site survey has been completed. Demarcation of roads in sector 1 and 3 is in progress.

Construction/ development of all site related establishment like store, security, plants, and machinery installation in progress.




welcome to loan (http://www.yloan.com/) Powered by Discuz! 5.5.0