subject: Things You Must Know Before Choosing Hardwood Floor Fitters [print this page] Are you looking for hardwood floor fitters? You must know that hardwood floor fitting includes various steps like sub-floor preparation, leveling, and finishing. In addition to that the hardwood floor fitters do beading installations, trimming of doors and frames, and damp proofing before the final installation is done.
If you are searching for school floor contractors, you must check the services that are offered by the contractors. Generally, reputed contractors provide the following types of services:
Supply and fitting of parquet flooring
Wooden flooring installations (both solid and engineered)
Concrete sub-floor leveling
Plying of wooden floors
Sound and damp proofing
Laminate floor fitting
Trimming and beading
There are different stages of fitting hardwood flooring. If you are looking for floor contractors you must make it a point to have an idea about the stages that are involved in the process so that you can make sure that the floor fitters you are choosing are doing the task properly. Read on
The foremost and most integral part of hardwood floor fitting is sub-floor preparation. Before new wooden floors are fitted, there are certain things that need to be done for a long-lasting result. Given below are a few steps that ensure that the hardwood flooring of your house stays in perfect condition for years to come:
Dust control Before lying of the wooden floors, the office or school floor contractors must make it a point to control dust. Subfloors needed to be cleaned and dusted for optimal functioning of the adhesive. Reputed hardwood floor fitters will use state-of-the-art technology and latest equipment to clean the subflooring and attaching the wooden floors. During the process, furniture and other articles of the house are covered and stored safely. Remember, use of latest equipment and technology reduce the amount of dust while the process is being carried out.
Moisture control Moisture or dampness is another factor that can lead to damaged flooring of the school, office or house, which may require a costly repair sooner than you expected. That is the reason the floor contractors should make it a point to remove all traces of moisture from the subfloor area before installation of the hardwood flooring. In addition to checking the temperature in the subflooring area, the contractors should also make sure to check the humidity and the condition of the pipelines that run under the floors. Only after a thorough inspection should the contractors lay the floorings.
Leveling of the floors The subfloor should be leveled properly and must be made flat. Otherwise, uneven flooring may result in loose flooring and deflection. Remember, even surfaces reduce sounds of footsteps on the floor. Sometimes it may be necessary to install a shock-absorbing underlay in the floor.
You must also remember that the school floor contractors or office hardwood floor fitters use different methods for installation of floors. Make it a point to choose a reputed service provider. Find out whether the professionals you are choosing are experienced and skilled to handle the type of task you are looking for.