The installation of a fixed conveyor roller should be required to install on a fixed basis. The mobile conveyor formally before running should the wheel or brake stopped living with a triangular wedge. In order to avoid walking around, conveying multiple local parallel operation between the machine and the machine, between the machine and the wall should be one meter channel.

2, the coupling must be inspected prior to use various working parts, the tape buckles and carrying device is normal, protective equipment are complete. The degree of tension of the tape to be before starting to adjust to the appropriate extent.

3, the nylon conveyor belt should be no-load start. Operating normally before feeding. First feeding drive is prohibited.

4, several sets of bucket elevator series run from the discharge end of the start sequence. All normal operation only after the feeding.

5, the operation of the belt run phenomenon, parking adjustment shall not be reluctant to use, so as not to wear to edges and increase the load.

6, the temperature of working environment and sent materials shall not be higher than 50 lower than -10 .

7, the conveyor belt against a pedestrian or by people.

, Parking must be to stop feeding the belt holding material unloading to do before parking.

9, the conveyor motor must be insulated well. The mobile conveyor cable do not Luanla and drag. Motor to be reliable grounding.

10, the belt slip is prohibited by hand to pull the belt to avoid accidents.

Installation Process:

A belt conveyor leg and the middle frame: before installation with a theodolite to find a good centerline, and then leads under the centerline position of each leg of the pile, if the embedded iron, should be appropriate depending on the location of the embedded iron adjustment in order to facilitate the installation company, the legs should be embedded parts firm.

Weight device: when installing the weight equipment to ensure parallelism between the two force column, and should ensure its verticality, weight equipment is installed, taking into account security should immediately install the protective railing.

3, the first frame, the tailstock and drive Frame: First verify the elevation of the installed base, to find a good centerline, and pay attention to the head, tailstock axis deviation is not greater than 1.5. Installation should also be noted that the setting of the horn should be based on the specifications, the horn located in the main load-bearing position, each connecting bolts on both sides should be placed on one pair of horns, paired set of oblique horn, the horn does not exceed 5 When we placed the horns thin horn on the thicker in the middle of the adjustment is completed, the horn should also be firmly welded the bolts to tighten.

4, roller set: roller and idler should be installed to check the bearing parts of the rotation, if rotation is not flexible and should be promptly repair or replacement. Drive pulley and bend pulley in debugging also need to adjust the position, the bolt tightening torque of the final screw torque 75 to 80 percent.

5, the unit installation: install the unit shall comply with the machinery and equipment installation construction and acceptance of universal norms "(GB50231-98) and relevant national regulatory requirements. Its unit centerline deviation is 0.02mm, and the coupling of the radial error of 0.05mm, and face runout is 0.02mm, the gap between the coupling half 3 ~~ 5mm. Should also ensure that the use of unit level and the horn of compliance requirements.