subject: Construction Works: The Reason And Preparation Of Project Quality Plans [print this page]


The aim of a Project Quality Management Plan (PQMP) is to inform and steer your personnel concerning the particular quality tactics, assets, variety of actions, controls and assessments that they have to put into practice during the Contract.

Ahead of the start of construction works, Contractors have to make a Site-specific Project Quality Management Plan (PQMP) detailing the control procedures that is required to point out its capability to regularly provide products and services that meets client and appropriate quality standard criteria.

The Quality Management Plan ought to follow applicable ISO 9001 standards and contract requirements for the project.

Affiliated technical paperwork that needs to be prepared and incorporated with the PROJECT QUALITY PLAN:

* Documentation necessary for specs to organize and apply operated situations for work procedures; and

* Inspection and test designs and ITP forms that will be used by you to verify that the Works adhere to the Contract

Once setting up regulated circumstances for work routine, check out the following controls:

* sequence of operations;

* sorts of devices necessary, capacity, routine maintenance, calibration;

* whatever specialized working environment areas;

* experience and abilities of employees;

* work strategies and supplies for use;

* item properties, specifications and skillfullness ideals to be reached;

* usage of routine control graphs, when stated;

* inspection, test and control points;

* how the procedure will be monitored ensuring its lasting viability;

* records to be held on to as evidence that the work process controls remain successful; and

* defining duty for utilizing and following work process controls and fixing whatever deficiencies.

The above mentioned requires the preparation of technical methods and/or Assessment and test plans for every single work activity, eg, earthworks, concreting, etc

The PQMP must, as a minimum include the following, if appropriate:

* Matrix presenting the quality management system when not in accordance with AS/NZS ISO 9001:2008

* Classification of relevant corporate quality management system measures.

* Explanation of how corrections to paperwork and data highly relevant to the Work Under the Contract should be identified in the document or best suited attachments

* Explanation of how top quality records will be kept and maintained

* Project Quality Aims

* List of key duties and authorities of personnel primarily responsible for quality assurance functions on this Contract

* Nominate Management Representative and Project Quality Representative. Identify reporting connection, if these roles are performed by varied people

* Minimum criteria and experience expected of the Project Quality Representative

* Site specific induction and training plan and procedures

* Design Plans for all the design functions, consisting of subcontractors involved for design work

* Document methodology and outcomes of subcontractor evaluation for work methods that require process affirmation (when suitable)

* Purchase planning facts

* Subcontractor's PROJECT QUALITY PLAN or process control documentation for every subcontract

* Method of monitoring for subcontracted work

* Work process control documents

* Identification of work techniques where the producing result cannot be verified by succeeding inspecting and measurement

* Dealing with identification and traceability

* Method of sustaining traceability for items (when requested)

* Methods for subdividing the work into lots and allocating lot numbers

* Description or how Principal provided property will be handled

* Method of safe guarding products

* Method of control of tracking and measuring technology

* Inspection and Test Plans, ITP Record Forms for all of the inspection and assessment needed by the Specifications

* Method for identifying and controlling inspection and test status

* Methods to assess customer satisfaction

* Audit timetable

* Method of overseeing the strength of work techniques

* Method for confirming that every evaluation and/or exams are performed at the needed testing frequency

* Method for release of Hold Points

* Traceability/closure method for close-out of work lots

* Methods for coping with non-conforming goods and services;

* Any other files or information essential for specifications to be part of the PROJECT QUALITY PLAN

And for forms of service or product subcontracted these must be part of the PQMP:

* Purchasing plan which states the time of procurement of the goods and services to be subcontracted and includes supply for the approval process

* Your method of diagnosis of the subcontractor's ability to satisfy the subcontract specifications such as the quality management system requirements specified

* Your policy for evaluation and security of the subcontractor to ensure the whole process of the quality management system and product conformity requirements

* All stipulated evaluation and testing demonstrated in the subcontractor's Inspection and Test Plans

Choices to develop quality management plans

You have few available options to get your Project Quality Management Plan (PQMP) they are:

* You ready your own plan with the expertise and sources found in your group (preferred option), after this instructions,

* You hire a expert to write for you (least desired option),

* You acquire a template from vendors on the internet and you modify to details of your organisation and project (economical and best alternative). Tailoring the template by YOU and YOUR team provides you with ownership and knowledge of the plan and self-confidence to implement it.

The choice is yours, fundamentally to have a plan which is:

* easy to comprehend and execute,

* written in plain English so everyone comprehends it, and

* compliant to ISO 9001:2008 Quality Management Systems standards and contract specification

If you dont have the experience or assets to write a plan from scratch, you can get a Project Quality Management Plan with all those attributes at www.complianceleader.com