subject: In The System Of The Grinding Ball Mill Shortcomings [print this page] In the system of the grinding ball mill shortcomings_Ivylm522The ball mill using this calibration procedure to check the LCXK-V and the measurement accuracy of the scale body.
Weighing section load is automatically acquired by one or more of the complete belt running cycle, the average tare weight and the belt load.The results with pre-set compared to the value displayed, but does not automatically corrected.Results need to manually enter the parameter P08 (specific calculation to see parameters below).Update P08 jaw crusher parameters must be re-addition to skin small knowledge of the mill filling rate summary.
Prerequisite:
Discussion with Mr. Shaw: simplify, tense, first person, rationality, or personal characteristicsIn addition to the end of the skin or zeroing procedures block machine have been run.
2Weight value input to the parameter P07.
3Weight on the weight bracket.
4.The scale must be running.
The program is running:
The upper display: the remaining running time.
The lower part of the show: the continuous load measurement ball mill results with pre-set compared to the value value.
The end of the process:
The upper display: the program is running, it is assumed that the volume of jaw crusher feed.
The lower part of the show: the total program run time, set the value / measurement value of the ratio of KOR.
(In the parameters of the scale body entered in the correct circumstances)
The difference is less than 5%: KOR = 0.95 ... 1.05
Parameters will be further amended.
The difference is greater than 5%: KOR 1.05
Deviation is too large, the description of the technical data errors (such as: the ball mill leverage ratio is not accurate) or mechanical scale body there is an error (such as: weighing frame deformation).