subject: Preparement Before Starting A Crusher [print this page] The main technical parameters to optimize the design and development into new crushing and coarse grinding products, mainly used in small crushing cement raw material, clinker, used in construction sand, iron ore, sandstone, gypsum, coal gangue, lump other medium hard ore crushing. With broken than large, less can ho, smooth operation, simple structure, easy operation and maintenance. Is a true multi-purpose,high efficiency, low cost of a new type of crushing prepared.
Before the start of the crusher equipment must be tested in order to avoid problems inthe work process, resulting in greater consequences, so be sure to test the job, then thecrusher equipment to do before the start of what kind of work, here we one by one to tell you about.
A thrust plate and sustain mutual cooperation between the seat pad is normal, whether the tilt shift with string.
Ministries screw fastening off.
3, fuel pumps, oil ring is functioning properly, the tubing is blocked.
4, the operation (sensation and sound) are normal.
5, the creamy point of the oil situation is appropriate.
6, the request of the gap site the friction appearance (especially moving parts of the Eaxis).
7, the funnel is blocked, to the amount of ore to one side.
8, the motor load, temperature, sound condition.
9, spring elastic situation is normal.
10 ministries bearing temperature should not exceed 50-60 degrees.