subject: Seven Criteria To Maintain The Raymond Mill [print this page] Raymond Mill, also known as Raymond, due to Raymond and stable performance, adaptability, cost-effective, since the introduction of China's 20 years, has been universal for non-metallic minerals processing. Raymond Mill should be developed equipment "equipment maintenance safe operation of the system can ensure the mill long-term safe operation at the same time has the need to learn some of Raymond and nurturing to maintain common sense when they encounter problems timely.
1, Raymond in the course of which should be staff responsible for custody, the operator must have a certain technical level. Mill prior to installation of the operating personnel must carry out the necessary technical training, Raymond Mill, Principles of performance, are familiar with operating procedures.
2, in order to make the mill should be developed equipment "equipment maintenance safe operation of the system can ensure the mill long-term safe operation, have the necessary tools for maintenance and grease and the appropriate accessories.
3, hongxing Raymond use for some time, should be carried out maintenance, roller mill ring blade and other wearing parts, maintenance replacement treatment, roller device before and after the use of the connecting bolt nuts should be carefully examined to see whether loosening, the grease is to add a little.
4, roller device to use time more than 500 hours to replace the roller, roller kit, rolling bearings must be cleaned and damaged parts should be replaced refueling tool can be used manually pumps and grease gun.
5. The fineness of adjustment, depending on the size of the materials, hard and soft, moisture content, the proportion of different processing thickness is also different, you can adjust the top of the analyzer, high speed, fineness, low speed, low fineness.
6, the roller mill Central scrapped limit, the remaining minimum wall thickness not less than 10mm.
7, Raymond Mill parking, stop feeding, the host continues to He, residual abrasive continue to milling, after about a minute, you can turn off the host motor and analyzer motor to stop the grinding work, followed by stop the fan motor in order to blow the net residue of the powder.