Board logo

subject: The Country's 30 Provinces, Nearly 2.3 Trillion Debt Of Toll Roads [print this page]


Ministry of Transport spokesman He Jianzhong said yesterday that as of November 11, there are toll roads toll road all the provinces have been investigated thoroughly and the results published. Through inquiry, ugg bailey bootsexcept Tibet without toll roads, the other toll roads in 30 provinces total debt balance of nearly 2.3 trillion yuan, in addition to the toll road toll last year amounted to 285.946 billion yuan.Special clean up the country road toll thoroughly investigated the first phase of the end of August. Thoroughly the situation can go on the website of the relevant provincial government, except Tibet, the 30 provinces and autonomous regions have been thoroughly carried out on the public.There are open content, "Toll Road Information Disclosure" and the "main site maps toll roads," the two, including toll road mileage, mainline toll stations, investment and debt situation and the operation of 2010 and other large items.Released by the city in all provinces, Chongqing, ugg dakota slippersalso announced a "toll road project summary", which set out in detail the name of the 27 charges, management or business units, starting and ending point charges, opened to traffic in time, beginning and ending time of approval of charges, mileage charges, toll station names.According to the published information, 30 provinces in total debt balance of toll roads 2.2911 trillion yuan. Hebei, Henan, Zhejiang, Guangdong, Shaanxi, Shandong, Jiangsu, Yunnan and other 8 provinces are over hundreds of billions of debt. Among them, Guangdong, the highest total debt balance of 2267.4351 billion.Last year, the toll roads of the provinces nationwide toll 2859.4614 million, most for repayment of fees, ugg boots classic tallof which 95% of charges for repayment of Jilin.Most provinces in the repayment, and then deduct maintenance expenses, operation and management expenses, taxes and expenses, depreciation or amortization and other expenses, are "living beyond their means", and a larger gap, Shandong is the loss of 8.7 billion.September 1 - December 31, special clean-up toll roads into the national self-correction phase. Over the basis of thorough investigations, to the existing toll roads, toll duration, fees, toll stations (points) and the collection of fees for each examination.He Jianzhong said that at present most of the provinces and municipalities are required to proceed in accordance with the development of specific remedial measures.This reporter has learned that last year, ugg classic shortthe amount of Guangdong highway toll is 270 million yuan, loan amount is 135 million yuan, net of all expenses, losses of more than 2.29 billion yuan, of which the highway operating loss of 2.27 billion yuan. Insiders said that the current highway industry, the huge debt problem does exist, but the charge is sufficient for repayment. Previously, the Guangdong Provincial Government loan made ??in 2012 to cancel two highway toll station. But in 2010 the amount of repayment of the secondary road toll was 789 million yuan, amounted to more than 770 million yuan loan. Even so, the remaining balance of 70 billion debt, ugg boots free shippingthe next two years is certainly difficult to repay. So cancel the repayment of two toll road charges how to solve specific, relevant departments are studying.

by: george




welcome to loan (http://www.yloan.com/) Powered by Discuz! 5.5.0