subject: How The Construction Phase Plan Works? [print this page] When you are setting up the control and management of health and safety on a construction site, nothing is really important than the construction phase plan. This is meant to help the chief contractor - the site proprietor or manager - to deal with all of the health and safety disadvantages and manage plants that the project demands. Irrespective of whether the project concerns the building, renovation or destruction of a building, the construction phase health and safety plan is needed to make sure that no-one gets hurt during the project, and that the business is completely insured against any compensation statements.
Meeting the wants of the construction phase plan could be difficult, since most contractors on building sites have no law degree, and are not fully familiar with all the present necessities of the laws regarding health and safety on work sites. So as to make sure that everyone on the site is protected by the plan, the document has to include all of the details of hazards, the control measures used to protect against disadvantages, and how the measures will be applied by each member of the construction work force. It is all very complex, and the majority managers of construction sites delay writing the plan unless they absolutely has to.
Though the construction phase plan is lawfully required, contractors on too many construction sites neglect this important tool. They usually try and draw up the plan themselves, with no training. This can lead to the plan being wrongly formatted, without the vital ingredients, and not having included all of the legal documents and rules that are required by the particular project at hand. This could signify that, should an accident occur while the plan is still in its weak format, the contractor will be legally liable and could be sued.
Contractors sometimes attempt and avoid producing an incorrect construction phase plan by employing someone else to write it for them. This is sometimes a former health and safety operative, who has turned to writing plans as a means of earning a living. This can mean that the plan is really costly, since the writer has an interest in creating the most costly plan possible.
Another solution is to use a template. This can be done by the contractor themselves, but means that they're doubtful to wind up with a non-compliant record. The template will facilitate the writer to create the plan employing a sequence of formulas. The consultant simply marks off the parts of the plan he needs, and then the template produces a completed document.