Have detailed drawings been provided and approved? Y / N
Will the Contractor be responsible for permits and inspections? Y / N
Will the Contractor remove all demolition material from the property? Y / N
How often will the work site be broom swept? ________________________
What type of material is being used for the kitchen cabinet doors? __________________
What type of material is being used for the kitchen cabinet boxes? __________________
What brand name and style of hinges are being used? ____________________________
What brand name and style of handles / knobs are being used? _____________________
What is the quoted budget for the kitchen countertop $ _____________
Is there a preferred company we need to choose the countertop from? Y / N ____________________________________
Has the sink been selected so that dimensional information can be provided? Y / N
Has the kitchen faucet's been selected for the sink? Y/ N
Will a temporary countertop, sink and faucet be installed in the home to make a functional kitchen until the renovation has been complete? Y / N
Mechanical and kitchen plumbing functions of the kitchen renovation
If there's new appliances and lighting, will the existing service panel support these additions? Y / N
if no, are the electrical upgrades included in the quote? Y / N
Will all kitchen electrical fixtures, outlets and switches be on GFCI Circuit breakers? Y / N
What is the Budget for lighting fixtures? __________________________
Is there a preferred company to purchase the lighting fixtures from? Y /N
If yes, company name _____________________________________
Are the appliances changing? Y / N
If yes, have the new makes and models been provided to the cabinet makers to ensure the appliances fit properly after the cabinets and flooring have been installed.
Are there any special features that are included and need to be picked out prior to proceeding with the kitchen renovation i.e Central Vacuum, base boards, garbage disposal? Y / N
If yes, please provide details. ________________________________________________________________________
Is there any new plumbing required, including the moving of sinks and dish washers? Y / N
The homeowner of this project does not wish to be the lender on this project and as a result, an excessive deposit or a heavily front loaded payment schedule
will result in the rejection of this proposal. After the initial deposit if any at all, the homeowner expects to pay no more than the material and labor invested for a
satisfactory of performed work, withholding final payment until all professional and personal inspections have been completed.
This document is provided by Contractor Quotes as a guide and the use of this document should be as such. It is recommended that you have this viewed by a lawyer to ensure that the document covers your home renovation and property in full. Contractor Quotes is not responsible for any loss or damages as a result of using this document