Board logo

subject: Deep Blue Is Committed To The Use Of Industrial Waste Heat Released Water Chiller [print this page]


With Energy Environmental protection Policies to promote industrial areas ( Oil Petrochemical, steel, metallurgy, and nonferrous metals, electric power and cogeneration, coal, industrial Boiler , Pharmaceutical, chemical fertilizers and pesticides, pulp and paper, machinery, wine, etc.) and waste heat utilization would be gradually dug up, with waste heat as a heat source of lithium bromide absorption chillers will be the industry's direction. A large number of practical skills through the accumulation of experience and accurate data of the hope that the strong blue introduced LiBr absorption heat hot water unit. Among the many industries in the hope that blue lithium bromide absorption heat hot water unit can reasonably be used in the production process waste heat to produce the required cold source technology, a significant reduction in power consumption, reduce carbon dioxide emissions. Characteristics according to use, research and development of the steam type Chiller Group, water chiller unit, fully meet the needs of industrial customers.

Units available waste heat / waste heat range:

Water: 68 ~ 140 . Steam: 0.02MPa ~ 0.8MPa. Unit design features: Vacuum: long drop ejector hybrid auto exhaust systems. Equivalent number of micro-extraction Pump Continuous exhaust, to ensure unit is always in high vacuum.

Anti-blocking: the corresponding type cream separator plate structure, effectively prevent the absorber spray block to extend the service life of unit.

Pollution Prevention: occurrence of flash separation devices. Concentrated lithium bromide solution will decompose into a flash and took place in two stages, namely treatment, to prevent refrigerant water pollution, to ensure stable operation of units.

Anti-crystallization: Automatic dilution and melt crystal interlocks. When the solution concentration or temperature near the critical point, the unit automatically dilute lithium bromide solution and heated in advance to eliminate the possibility of crystallization of lithium bromide solution, to ensure the reliability of plant operation.

Continuous operation: Under harsh operating conditions of industrial projects, can not be interrupted and so on. Hope that the dark blue using patents developed heat lithium bromide absorption chiller, long continuous run, to ensure that production requirements.

Active links Air conditioning design and selection

dark blue smooth face of Wuhan station

7 17, Design and Selection of blue face (Wuhan Station) in Wuhan, Hong Yi Hotel Held. Design Institute of Hubei Province from nearly all major designer and dark blue for the zero distance of communication. At the meeting, the Group Li Xu briefed the new Minister for Energy Industries Group, the situation has caused great interest of participants; dark blue company Xiongzi Ping total work focuses on the dark blue waste heat recovery technologies, products and case design is very pertinent to their needs, in the Council and in warm again after the cause of. Deep Blue, said design consultant institute to do well, a good designer assistant.

Related topics: Heating industry in China Top Ten Brands Award Presentation Ceremony

Related Reading: Deep Blue Air business model won the title of building energy saving

Blue air conditioning experts were invited to teach Chinese Association of Automation

Deep Blue Group Maoxian board room full end housing projects

Deep Blue Is Committed To The Use Of Industrial Waste Heat Released Water Chiller

By: frbiz2@163.com




welcome to loan (http://www.yloan.com/) Powered by Discuz! 5.5.0