Board logo

subject: Cang Lian Pump Leak Research To Create "zero" Target [print this page]


"In recognition of the past somehow, I think they have managed just fine, and there is wisdom for to research it? To see these machines are now Pump , I considered that Sha is the endless pursuit of it! "- Cang refining thematic research activities carried out by pumps, just a quarter of the level of site management on to a new level, but also to a large number of operatives were sent inner feelings.

Depth and meticulous management, solidify the concept of chi, first-class corporate governance, compliance in the industry under the premise of the pursuit of pump "zero leakage" of the ultimate goal is to promote the on-site management Cang Lian another move. Starting from the end of November last year, the corporate mobile, inspection maintenance and workshop professionals research group, allocation of special funds, aimed at the "details" implementation of the pump leak-free research. They are prone to leakage for the whole plant and leakage of more than 1000 pump action Seal Point, as a breakthrough in research on problems carefully combed, the first call of experienced professional technicians introduced machine repair and all kinds of mechanical seals Oil seal Leakage occurs, and then workshop on the Organization of round find out and remove their pumps, the statistics of the operational status of each pump and leakage, leakage points for detailed analysis to identify various types of countermeasures, and one by one, the right medicine "detoxification Qubing" .

Research group in the management of a strict control to avoid becoming a mere formality and to ensure effective research activities. The first process control. Each leak is not only responsible for and completion time, there are specific corrective measures and targets; second is gradual. Pump advance rectification similar problems a few sets of tracking performance at any time, effective after the effective point to an area to other pumps on; third is continuous improvement. Weekly meeting topic will track the progress and effectiveness of measures to implement the material and personnel, and statistics reveal new problems, different categories remedy. 10 units of oil mist lubrication system for oil mist lubrication fittings and the bearing box at the bottom of the leakage oil port access, they will change repeatedly demonstrated tubing connector to terminals, so that leakage completely changed; for each device common machine pump rubber seal leakage problems, they Tracing the source, the total replacement for the reliable composite oil seal; on the restructuring of heat carrier pump P2601 mechanical seal leakage frequent "persistent" problem, after repeated analysis they found the sealed chamber high temperature caused by leakage of the "Focus", all the installed seal oil cooler, so as to solve the fundamental problem.

In the past, due to frequent mechanical seal leakage, vacuum pump by the end of the first seal to be replaced every two weeks, after transformation, no leakage of the pump well over a quarter of the state; since taken measures with a rubber seal, the total is the permeability of the atmospheric heat Pump 128 bearing bottom of oil discharge Valve Achieved a "drop of oil does not leak." Even more gratifying is the pump running at the same time improve the level of equipment management to achieve a truly high-quality "axis see light, ditch bottom, equipment see the true colors" target.

by: Frbiz




welcome to loan (http://www.yloan.com/) Powered by Discuz! 5.5.0