subject: Chen Cheng Plans To Build Four High [print this page] Speed: form a "one-hour traffic circle" Speed: form a "one-hour traffic circle"
"Planning" content: the highway, the Planning and form a "two-part seven shot a transit" of the highway network.
Interpretation: At present, the "two-part seven shot a transit" Shenyang highway skeleton shape. "Two-ring" around the city is Shenyang expressway, highway around the city in central Liaoning Province; "seven shot" that Shen Fu (nanzamu), Shen iron, Shen Chang, Shen Hong, Shen Dan, Shen-Da, Jing Chen, etc. 7 Highway; "a transit" or iron (LU) Korea (Yang) high-speed road. The future, the center of the city of Shenyang, Shenyang Economic Circle will be built.
Railway: Chen Cheng planning four high-speed railway
"Planning" content: the railways, passenger and foreign goods within the principle of the formation of Shenyang Railway "two series, three-passenger, four cargo," the general pattern of high-speed rail plan 4, respectively, Harbin PDL, Beijing-Shenyang Dedicated Passenger Line, Shen Dan Passenger and Shenyang Dedicated Passenger Line, planning five inter-city rail, respectively, Shen Fu, Shen iron, Shen Ben Shen Shen Chang-Liao saddle and intercity rail.
Interpretation: high-speed railway is 200 kilometers per hour operating rate of the rail system. But this standard, EMU has been achieved. At present, the goal of building high-speed railway, 350 km per hour in line to the. According to "China's railway and long-term railway network plan": 2020, China will build 12,000 kilometers above the passenger line, the establishment of provincial capital cities and between cities fast passenger corridor, the formation of "five vertical and four horizontal" rail rapid passenger access. Liaoning is one of the five longitudinal important nodes.
Transport capacity Harbin Harbin, Dalian south length of more than 900 km, completed a top speed of up to 350 km. Dalian Passenger Dedicated Line is expected to be opened to traffic by the end of 2011, after completion, Harbin to Dalian, the running time shortened to 2.5 hours. Beijing-Shenyang Dedicated Passenger Line length 684 km, via Lingyuan, Kazuo, Chaoyang, North tickets, Fuxin, Xinmin, the completion of Shenyang to Beijing from just 2 hours and 18 minutes, will start construction this year.
In addition, Shen Dan Passenger only 207 km length, the maximum operating speed of 250 km. This line of Liaoning Province as an important railway line, connecting Shenyang and Dandong, the project will substantially increase the personnel, material flow rate into the Bohai economic circle important pathway.
Air: build an aviation hub in Northeast Asia
"Planning" content: in civil aviation, planning to become Taoxian airport complex in Northeast Asia gateway hub airports, expansion of the terminal, the new second runway, and to develop long-term conditions for the four runways reserved .
Interpretation: Last year, Shenyang, China Airport breaking 7.5 million passengers transported passengers this year, the airport plans to achieve the throughput of 9 million people, and strive towards the airport to 10 million goal. However, general manager of Liaoning Province Airport Management Group, Song Yuqi introduced, with the increase in airport throughput, the existing scale of the airport has been unable to meet the rapid increase in routes and throughput. Airport long-term construction plan, beneficial to the development and introduction of capacity and flight network planning.
Present, Shenyang Tao Xian International Airport, only one runway, this year, the airport plans to launch three terminal and second runway construction. At the same time, reconstruction and extension of the old terminal is expected to be put into use in May of this year, the terminal mainly serves the aviation branch.
Taoxian size of the airport runway system, terminal building at least four runways to meet the 70 million people or more passenger throughput requirements, the airport terminal area of 400,000 square meters. Around the same time to achieve the airport's public transport organizations, the aviation city, business logistics, the construction of a harmonious environment-related planning and coordinated. As for the overall planning of the four runway construction, expected to grow at an existing airport runway, based on re-building of a north, south and then build 2.