Board logo

subject: Solenoid Valve on the problems of procurement and selection [print this page]


Solenoid Valve type, material, and pipe connections and accessories selection, preparation of tender documents, bid evaluation, technical contract signing, installation, maintenance is a cumbersome and complex process, any part of a loophole are likely to affect Solenoid Valve use. Although there are a variety of books, standards and software for designers and users of information technology personnel, generally will not have much difficulty, but the officer from the process design parameters, Solenoid Valve for tender documents, tender issued , evaluation, technical clarification, the formation of evaluation reports, approval of evaluation reports, technical negotiations, signing of a technology contract to box inspection, installation, commissioning, and put into use, generally after a very long time, during which little effect on a will be missing one or more of negligence or may cause losses and affect plant projects. This article is only in times of Anhui Huainan Chemical Group Co., Ltd. Solenoid Valve procurement and use some experience and knowledge in a summary, the proposed procurement Solenoid Valve should have sufficient time, as long as technical conditions have to be in advance of tender documents preparation, evaluation, technical clarification, signed technology contracts, etc., really do careful and meticulous work of deep, less a technical fault. As for the progress of business contracts, and funds will have to progress under the Fiber Optic Splice Closurecircumstances.

Solenoid Valve on the problems of procurement and selection

By: zll10417




welcome to loan (http://www.yloan.com/) Powered by Discuz! 5.5.0