subject: What To Consider When Carrying Out A DIY Drain Project [print this page] Ensure that all parts of your drainage system are designed so that all parts of pipe work are accessible to a set of drain rods. Moreover, direction change of the pipe work should be provided with an inspection chamber to allow rodding access. A junction without a manhole, access should be sited on the branch drain within 12 meters of the junction. Remember, it is important to follow local building control regulations.
What To Consider When Carrying Out A DIY Drain Project