Board logo

subject: Installing Glass Kitchen Tile Backsplash On Drywall [print this page]


Can be installed tile kitchen [backsplash] glass give you a major upgrade over the drywall Normal is currently there. [Backsplash] makes the existence of the wall a lot easier to clean up after cooking compared with drywall. In addition, tile, glass and presents you with a very stylish look that you see in a lot of high-end homes. However, if it is not working correctly, it can be in fact look worse space. Here are the basics of how to install glass in the kitchen [backsplash] drywall.

Materials required for this post

* Glass Tiles

* Mastic

* Do not plaster, sanded

* Trowel

* Grout Sealer

* Sponge

* Bucket

* Tiles

* Cloth

* Tape measure

Step 1 - Preparing drywall

The first thing you need to do is make sure that the drywall is ready to install on. You need to make sure they are very clean and free of any dirt and oil. You can use a piece of cloth and clean home for the Elimination of the wall. Let the area dry after cleaning.

Step 2 - Is it to dry

Before you start to install the glass tiles, and can help to do it dry so you can see how it will look like. Put out the tiles on the counter or on the ground in the pattern that you plan to install them to enter an area on the measurement of [backsplash] that you plan to install tile on. With this measurement, you can see exactly how much you have room to work with and get the right picture in your mind.

Step 3 - Start the installation of tiles

With a shovel, start posting some mastic on drywall. Make sure to try and spread the disease as seamless as possible. Mastic needs to be level and even across the surface of the drywall. Once you have some mastic up, start pressing the tiles in it. Make sure that the tiles are placed in direct, butted against each other as you want. If the glass tiles come to support the network, all you have to do is press it into the mastic. Then put the paper web coming from the tiles next to the first one.

Step 4 - Let the mastic dry

Once you have completed the installation of tiles, back and left her alone at least 24 hours. The mastic will dry in that amount of time and begin to harden. Make sure that does not affect one of the tiles during this period, it is crucial to the overall look of tile.

Step 5 - plaster, brick

The use of injection is covered with sand to fill the gaps between the tiles. You must apply the grout with a trowel plaster. Forced to joints that push it across the tiles with a shovel. Use sponge to eliminate excess grout off the tiles and plaster relief of the joints. If you see any fog developing on the floor, and wipe it off with a soft cloth. After the completion of the fillers, let it sit overnight to dry.

Step 6 - the seal on the plaster

The application of grout sealer to the joints to prevent any staining in the future. Must be able to brush up on with a rod that comes with the leakage of plaster.

by: umar




welcome to loan (http://www.yloan.com/) Powered by Discuz! 5.5.0