Welcome to YLOAN.COM
yloan.com » misc » Matters Needing Attention In Operating Ball Mill
Gadgets and Gizmos misc Design Bankruptcy Licenses performance choices memorabilia bargain carriage tour medical insurance data

Matters Needing Attention In Operating Ball Mill

First, before starting the equipment, check whether the whole equipment and its key

component is good or not; check whether there is loose situation on each connecting bolt of the ball mill; check whether the lubrication of each lubrication point is normal or not; check the transmission and protective equipment; check the electrical instrument and the carbon brush for electric machine, which can ensure the normal work of the ball mill.

Second, turning a week, check the rotation parts of the equipment and check whether there are some obstructions around the equipment or not. If there are, remove them. Note: when starting the equipment, it is not allowed to stand around the equipment.

Third, after checking and ensuring every part of the equipment is normal, can the start button be pressed. Note: when starting the equipment, pay attention to the changes of the current. Hongxing experts remind users that the ball mill can not be consecutively start more than twice. The spacing interval between the first and the second start must be more than 5 minutes. If the third start is necessary, the ball mill must be checked by the conjunction with electricians and the fitters first. Note: the ball mill can not be started with other equipments at the same time. It is necessary to start them one by one, which can avoid the tripping operation happening.

Fourth, when the ball mill is in normal operation, the overloading operation is forbidden. And the idle running time must be less than 15 minutes, which can avoid bunging up the lining plate.


Fifth, in the running process, it is necessary to check whether there is a plasma leakage phenomenon on the cylinder. Check whether the current, voltage, feeding, and the water supply are normal or not. Check the motor per half hours and the temperature of the principal axis should be less than 60. Solving problems must be in time.

Sixth, before stopping the ball mill, the mineral supplying must be stopped first. After finishing disposing the concentrate, stop water supplying. And then, press the stop button and pull down the gates.

Thats all.

ore beneficiation : http://www.ore-mills.com/

by: jocelyn
Snowboarding At Thredbo Make Your Tea Break More Enjoyable With Mandel Bread Cookies An Expert Help To Lawyers By Expert Witness Ibm-branded Lto4 System,the Most Compact Midrange Tape Format Coolest Things To Do In Madrid During Your Stay Pondicherry To Chennai Form The French Riviera To The Cultural Hub Plan A Reception To Ultimate Perfection Planning A Funeral A Humble Send Off To The Dead Acting School In Los Angeles Master The Craft 5 Tips For Great Backyard Camping Fun A Perfect Carpet Cleaning Guide Reaching From Bangalore To Wayanad Dark Caramel Highlights: Ideal Way To Improve Your Look
print
www.yloan.com guest:  register | login | search IP(216.73.217.98) California / Rosemead Processed in 0.016748 second(s), 7 queries , Gzip enabled , discuz 5.5 through PHP 8.3.9 , debug code: 16 , 2242, 85,
Matters Needing Attention In Operating Ball Mill Rosemead