Penalty And Damage Claims Arising From Misconduct Or Negligence
A construction or civil engineering contract comes with certain pre-conditions for the employer and the contractor
. Among others, these detail the expectations the employer has of a contractor to fulfil an obligation to meet particular criteria and finish sections of the project within a specific time period and budget.
When a contractor does not complete a project or part thereof on or before the agreed date, the employer can impose penalties on him or lodge a claim for damages.
In terms of liquidated damages, the usual circumstances involve a contractor wanting to claim for an extension of time to the completion date when he believes that he is not responsible for the delay (that way, he avoids having to pay liquidated damages or penalties). Conversely, the employer attempts to do just that exercise his right to deduct a predetermined liquidated amount of damages, or a penalty, from monies due to the contractor if he believes he is responsible for his company's failure to meet the completion deadline.
A claim for damages puts the innocent party back into the position it would have been in had the contract been properly performed, effectively compensating them for the inconvenience imposed by a breach, or breaches, of contract. This is the case with any breach of contract the innocent party can rightfully try to recover damages caused by the breach and that were reasonably foreseeable.
Construction and civil engineering contracts should contain a provision for liquidated damages that specifies a fair and accurate pre-estimate of the loss that could be incurred by an employer after a project delay. This would predetermine how much compensation would be necessary to place the employer in the position he would have been in had there been no delay.
In South Africa, a top legal firm's experience is that an employer will accept penalties (liquidated damages) for delay and performance ranging between 10% and 15% of the contract price. Insurance coverage is also a consideration to protect both parties under these circumstances.
It is advisable to secure
legal advice in managing disputes that arise out of these claims or, better yet, employ a legal consultant on-site.
by: Admin
Difference Between Sip Trunking And Hosted Pbx Services Guidelines For Your Cv And Cover Letter Plastic And Nylon Ties: Endless Possibilities Franchise India 2011 Presents Retail Knowledge Series On December 2nd And 3rd 2011 Simply By Outsourcing An Individual's Software Application Development, You'll Save Money And Time Cryptococcosis In Dogs - Symptoms And Treatment Setup And Configure E-mail Account With Outlook To Simplify And Organize Your Life The Fabulous And Advantageous Era Of Sending Free Text Messages To Everybody Divorce Mediation And Child Support In California Best Way To Convert Videos And Save Video To Mp3 Avail The Debt Services Collect And Run Your Finance Company How To Convert And Add Files In Mkv To Itunes On Mac Os X (lion Included) Spruce Up Your Home For Xmas With Wrought Iron Furniture And Accessories
www.yloan.com
guest:
register
|
login
|
search
IP(216.73.216.250) California / Anaheim
Processed in 0.016859 second(s), 5 queries
,
Gzip enabled
, discuz 5.5 through PHP 8.3.9 ,
debug code: 14 , 2355, 60,