Cement Production Equipment In Hongxing
Company cement equipment cement mill, cement rotary kiln and ceramic ball mill and other equipment
, these devices are composed of the main equipment of cement production line. Many customers called to ask us, how can on the basis of the existing production, Portland cement production line to further increase to a higher level! Today, we detail from production equipment, raw materials, as well as the composition of the production line to explore the main factors affecting the efficiency of cement production.
Portland cement clinker, 0% to 5% limestone or granulated blast furnace slag, finely ground made by the appropriate amount of gypsum cement matrix, known as Portland cement, sub-PI and P.II, namely known as foreign Portland cement.
Representative silicate cement production process in cement production is composed of limestone and clay as the main raw material, crushing ingredients, made of finely ground raw material, and then fed to the cement kiln burning mature, and then The clinker will add appropriate amount of gypsum (sometimes mixed with mixed material or admixture) Ground made.
Cement production with the raw material preparation methods can be divided into dry (semidry) and wet (including semi-wet method) two. Aluminate cement (1)dry production. The raw material at the same time are drying and grinding, or the first dry feed after grinding into a raw material powder dry method kiln burning mature. But there are also the raw material powder into raw material ball is made of the amount of water, into Lepol kiln burning mature, called semi-dry method, it is still dry production of one kind.
wet production. Raw materials plus gouache ground raw slurry, feeding wet kiln burning mature. Wet method after the dehydration of the raw slurry, made of raw material into the kiln burning mature method, called semi-wet method, it is still a wet production.
The main advantage of the production of dry heat consumption (for example, the dry process kiln with preheated heat consumption of clinker in 3140 ~ 3768 kJ / kg), the drawback is that the raw material composition is not easy even shop dust, higher power consumption. Wet process is a simple operation, easy to control the composition of the raw material, product quality, slurry transport, shop dust, etc. The disadvantage is that the high heat consumption (heat consumption of clinker is usually 5234 to 6490 kJ / kg).
Improve the rate of production line, hardware facilities is the key. The product quality of the cement mill, cement rotary kiln, and other auxiliary equipment must be reliable. Cement production line assembly must be assembled according to the actual terrain, to ask manufacturers for experts on-site guidance. The cement mill raw materials are also high, not what raw materials are the same mill to mill, and that would greatly reduce the life of the mill.
Jaw breaker : http://www.ore-machine.com/jaw-crusher.html
Stone jaw crusher : http://www.best-crushers.com/jawcrusher.htm
by: libby
Most Useful Bakery Equipment Blinds Melbourne Decorative Equipment For Multi Purpose! Pharmaceutical Machinery & Equipment To Save Your Life Wow People Are Able To Get Necessary Activity Equipments How To Find Reliable Medical Equipment Supply Company Supplementary Undeveloped Equipment Financing Meat Slicer The Trendy Commercial Kitchen Equipment Obzerv Technologies Offering High Performance Industrial Surveillance Equipment How Do Wireless Speaker Systems Work With My Audio Sources? Simple Information About The Ball Mill Equipment Standard Cafe And Catering Equipment Tickets And Equipment For Wimbledon Tennis 2012 The Benefits Of Home Exercise Equipment