Eastern Route Transfer Project In February And The Latest Development
North Water Transfer Project is the North Water Transfer Project Taierzhuang pumping
the seventh grade pumping station, located in Zaozhuang City, Shandong Province, the territory of Taierzhuang area for works. Pumping station metal structure is divided into pump body, cleaning machine and the drainage culvert gate gate three parts. Pumping station the metal body structure of flood gate in the intake of 5 holes to 2 160kN hoist mobile hoist; protective grille intake 5 hole; outlet gate of a total of 5 holes quickly, emergency gate of 5 holes, each hole to set the outlet 8 snorkel. Cleaning machine gates of nine holes and hoist for the 160kN fixed winch hoist. Drainage Gate on the three holes for the 250kN fixed hoist hoist Hoist, all gates (including the embedded parts, protective grill, vent, etc.) about the weight of 463.6 tons. Total investment of 2.3776 billion project, duration of 30 months.
Eastern Route Transfer Project In February And The Latest Development
By: mumu
I See Pipe Fittings Development Accelerated Muscular Development Torrent Accelerated Muscular Development System Volting Development New to Flex Development – Know What it is and 5 Benefits of Using it Career Development, Stand Out By Building Your Brand Personal Development and the Normal Mind The Redevelopment Of Manchester City Centre ab development Lodha Casa Rio Is A Grand Residential Development Hiring Drupal Developer For Custom Drupal Development Cakephp Development The Way To Excellence On Web Career Development: Connecting Theory and Practice
www.yloan.com
guest:
register
|
login
|
search
IP(216.73.216.125) California / Anaheim
Processed in 0.016286 second(s), 7 queries
,
Gzip enabled
, discuz 5.5 through PHP 8.3.9 ,
debug code: 4 , 1016, 369,