On the implementation of the "Circular of the State Council
, Ministry of Construction and other departments on promoting the modernization of the housing industry to improve the quality of the Several Opinions of housing" (National Development Office (1999) 72 Man), according to the Ministry of Construction, the State Economic and Trade Commission, quality and technical supervision, Building Material Bureau jointly issued a document "on the products in residential construction in the elimination of backward notification" (construction of housing (1999) 295) the spirit, and the Construction Department and other departments concerned to accelerate the popularization and application of chemical building materials and prohibit the use of backward elimination products, speed up promote the modernization of housing industry in Yinchuan, improve housing quality, eliminate inconsistent resource conservation and environmental protection requirements and poor quality of materials and products, and actively using the national standard for resource-saving high-quality materials and products. In accordance with the relevant provisions, since June 1, 2000 onwards, new residential, the prohibition of the use galvanized steel for indoor water supply pipes, combined with the actual situation of the Yinchuan area, especially in the proposed phase-out in the Yinchuan area housing pipes galvanized to implementation of the advice.
First, the scope and organization
Scope: in February 2001 after 1 Yinchuan for building, continued construction, expansion and maintenance of various types of residential projects and construction of residential facilities.
Set out the leading group behind the product, Xu Qing, deputy director of the Urban Construction Commission, the head of the members of the Municipal Administration of Quality Supervision Station, Water Company, Jieshui Ban, Construction Committee chief engineer, head of Urban Studies and composition. Under the leading group office, offices in quality supervision station, Comrade Lin Fan as Director of the Office by the.
Second, the implementation of the steps out of galvanized water supply pipe
1, to March 2001 before, improving information and reporting work so that all relevant units and departments can understand and grasp the situation.
Effect on March 2,2001, for all types of residential projects under construction by the leading group organizations conduct special inspections, supervise the use of UPVC pipe, aluminum plastic composite pipe, cross-linked polyethylene (PE-X) pipe, III no Regulation of polypropylene (PP-R) pipes and other new pipe. To prohibit the use of galvanized pipe, cast iron pipes and other countries eliminate backward and products. For outdoor residential area under construction must be used to water the new pipe.
3, for a new residential project report, construction drawings through the review shall be handled only take water and construction permit procedures, in construction projects through spot checks by the quality supervision station to supervise the construction unit required the use of qualified products to the water. New Residential Quarter in the outdoor water supply must use a new water supply, urban water supply pipe new construction should be preferred diameter of 400 mm for plastic (UPVC pipe) water supply.
Third, promote the use of new steps to the water
1, water pipe as product quality certification, production units must be obtained in Yinchuan City Construction Committee issued "Yinchuan product engineering materials and equipment certification", in the Yinchuan area before the promotion and use.
2, construction units in residential neighborhoods in project engineering and construction certificate must be used to obtain the water supply pipe.
Fourth, the design, construction, construction units should consciously eliminating inferior products, and actively promote the use of new products to the water. Used in the project out behind the product, once discovered, will be based on the Ministry of Construction, Ministry of Supervision "Construction penalties for certain violations of law", "Yinchuan City Building Management Ordinance" severely crack down.
1, new construction required to use out of the end product shall be ordered to immediately stop work and make corrections, refused to accept a heavier punishment.
2, for construction engineering inspection found that there product out to the water situation, and immediately corrected, not corrected, will not be filed after completion of the project, and shall be punished in accordance with. Is a commercial house, and will inform the housing sector, not be issued to pre-sale permit.
V. Construction Committee will be in accordance with national and regional and municipal regulations to supplement and adjust the time out of water pipe behind the product item.
by: gaga
Need A Hand Selling Or Buying A House? Think Before Owning A House Housing Market Recovering to help Mortgage deals Selling A House The Fastest And Quickest Way Tips In Finding The Right House Among Jenks Oklahoma Homes Tips And Warnings In Buying A House For Sale In Tulsa Types Of Houses In Tulsa For Rent And For Sale The Key Puzzle Grab Both Cmo And Auo's New Led Warfare - A New Cmo, Auo - Household Appliances Sell a House Quickly Without Leaving it Vacant Tips to Sell Your House Fast American Household Equities Still Healthy at about $7 Trillion House Prices And Household Appliances: Integration By Leaps And Bounds - A Refrigerator, Tv, Small Why Mohawk Carpets Are a Favored of Numerous Households