The Construction Phase of the House Building

The Construction Phase of the House Building


Site Work Site work include clearing trees from the plot, cutting rough unfinished driveway, placing stakes o mark, where the house plan dimension on the the plot and making up temporary electricity service and do the bore well for water supply, which further used in construction of house as well as after construction for house hold user.

If the plot level is below the road level dump the soil to bring the level of plot to the road.

Excavation & Foundation: - Digging the hole as per the drawing


Norms to be observed which laying the foundation

Take sufficient number of trial kits for exact study of the strata.

Confirm the strata with a consultant before proceeding for P.C.C.

Excavate the foundation bit at the same level and avoid the footing to rent on sloping strata.

Remove all the loose excavated material and clean the pit.

Site work

Excavation & Foundation

Framing

Roofing & Exterior work

Mechanicals (Installing Plumbing, electrical and heating/cooling system, security system running wiring for telephone, cable television placing pipes)

Interior Finish work, Trim, Final work.

Give the size of the excavation pit to avail the working space for the carpenter to fire and remove the shuttering box of P.C.C carry out shoring in case of block cotton soil to avoid accidents.

Insist on the foundation drawing to be incorporated with centre line plan to cross check overlapping of foundation, orientation of column etc.

De-watering of pits should be well planned.

Necessary permission should be taken prior to shifting underground service lines such as drainage, electric cables and water lines to start work.

Safety precautions should be taken while excavating. Sufficient lighting arrangements must be made to carry out the work at height

Take precautions so that the foundation of the adjacent building is hot exposed while excavating the basement.

You can take advice on construction of house by calling or visiting our website. This facility also available via online media. Our experts not only design the house but also knowledge the clients about the material specification and there impacts on the construction cost. Try to create modern house by planning with us. Thanks
Dollhouse Furniture – Ready-Made vs. Do-It-Yourself A Guide On How To Download House Of Night Movie Makeover for Your House! Roof Cleaning of Your House House Washing and Roof Cleaning - Use of This Combination to Clean Your House How to Ensure a Good Pressure Washer Cleaning Job for Your House? Bring Life to an Old House! Giving finishing touch to the household furniture articles to make it attractive Houseboat Tours Kerala – Get Ready to Treasure Lifetime Experience Luxury Houses for sale in Jupiter Wooden furniture that fits in to all the parts of house My house Salary Software : Problems Because Successful? A Beginner's Introduction to the Auction House
print
www.yloan.com guest:  register | login | search IP(216.73.216.105) California / Anaheim Processed in 0.017038 second(s), 7 queries , Gzip enabled , discuz 5.5 through PHP 8.3.9 , debug code: 42 , 2445, 182,
The Construction Phase of the House Building Anaheim